SWG was engaged to undertake the replacement of two heavily corroded steel balcony walkways and staircases to access the upper floor of a block of six ground floor flats and six maisonettes. The old stand-alone garages containing asbestos were demolished together with the construction of a new boundary wall, car park resurfacing works, landscaping works and the creation of a new bin store and seating area with pergola. The residential block remained in occupation whilst works were undertaken requiring regular communication with tenants, clear safe segregation, with Considerate Constructor practices undertaken throughout to minimise day to day disruption.